Guides
Guides
Everything below is the answer to a question somebody asked us on a phone call. No gated PDFs, no contact us for pricing. If we know the number, it's on the page.
- Licensed Texas General Contractor
- Bonded & Insured
- Workers’ Comp Carried
- BBB Accredited A+
- NARI Member
- On Site In All 50 States
- Escrow Services Available

Commercial Build Out Cost Per Square Foot
What build-outs actually cost, by space type, and the seven things that move the number.
Read the guide
Tenant Improvement Allowance: How It Works
What a TI allowance is, what is reasonable, and how to negotiate it before you sign.
Read the guide
Dental Office Build Out Cost
What a dental practice costs to build, driven by operatory count more than by square footage.
Read the guide
Restaurant Build Out Cost
Why restaurants cost what they do, and what a good second-generation space saves you.
Read the guide
AIA G702 And G703 Explained
What the two forms are, what goes on each, and why every lender wants them.
Answered on this page
Tenant Improvement Vs Build Out Vs Finish Out
The vocabulary, decoded. Three words, one job, and the regional assumptions behind each.
Read the guide
How Long Does A Commercial Build Out Take?
Realistic timelines by space type, and what actually causes the delays.
Read the guide
How SBA Loans Pay For Franchise Build Outs
7(a) or 504, how the draws work, and the six things that stall the money.
Read the guide
Certificate Of Occupancy For Commercial Space
What a CO is, when a build-out or change of use needs one, and what delays it.
Read the guide
Change Orders In Construction
What a change order is, what it should contain, and what to check before you sign one.
Read the guide
What Is A Demising Wall?
The wall that sets your lease line, why it runs to the deck, and who pays for it.
Read the guide
Retainage In Construction
The 5 to 10 percent held back from each payment, and when it should be released.
Read the guide
Schedule Of Values
What to check on your contractor's pay application, line by line, every month.
Read the guide
GMP Vs Lump Sum Vs Cost Plus
Three ways to price a build-out, who carries the risk in each, and which fits yours.
Read the guide
What Does Full Build Out Mean?
The listing phrase, decoded, and who actually pays for a full build-out.
Read the guide
Warm Shell Vs Vanilla Shell Vs Cold Shell
What each delivery condition includes, and the questions to ask about any shell.
Read the guideNext step
You Signed The Lease. Let’s Get It Open.
Send us the space and the brand standards. You’ll get a walkthrough scheduled inside 48 hours and a real number. Not a range, not a “starting at.”
No obligation. No pressure. If we're not the right builder for your project, we'll tell you on the call.
Questions first? Read the build-out FAQ
info@lnbconstruction.net