
We signed the lease in March and were serving customers in June. LNB walked the space with our drawings before we committed and told us exactly what the landlord's work letter did not cover.
Marisol Vega
Owner · Independent Cafe
By Service
Tenant Improvements
The landlord gave you a shell and an allowance. We turn it into your space.
Commercial Build Out Contractor
The same work, in the language most tenants use.
Tenant Finish Out Contractor
The Texas and Midwest term. Retail, restaurant, office and medical finish-outs.
Commercial Remodeling Contractor
Reworking space you already occupy, phased so you stay open.
Commercial Renovation Contractor
Bringing aging space up to current code and current standards.
Commercial General Contractor
Single-point contract, permits, trades, schedule and closeout.
By Space Type
Franchise Build-Outs
Your brand standard, built to spec, location after location.
Restaurant Build-Outs
Hoods, grease traps, health department, front of house. Open on schedule.
Retail Build-Outs
Storefront, fixtures, lighting, POS rough-in. Merchandise-ready.
Office Build-Outs
Class A finishes, demising walls, data, and a floor plan that actually works.
Medical & Med Spa Build-Outs
Treatment rooms, med gas, ventilation, ADA. Built to pass inspection first time.
Dental Office Build Out
Operatories, vacuum and air, imaging shielding, sterilization.
SBA-Funded Projects
7(a) and 504 draw schedules, and the documentation your lender releases money against.
AIA Billing (G702 / G703)
The certified payment application every bank, landlord and lender already knows how to read.
Our Process
Five stages, what you get at the end of each one, and what we need from you.
Financing
Spread the cost over months or years through our lending partners.
Guides
Costs, timelines and allowances, answered in plain language.
Where We Build
Headquartered in Katy, TX. Heaviest concentration across the Texas metros, and on site in all fifty states for multi-location programs.
On site in all fifty states. Don't see your city? Call us anyway.
All locationsServices
A tenant improvement contractor builds the space you already signed for into the business you signed for it to be. What it costs you is set by the allowance and the work letter, and most tenants only read those closely after the budget has already moved.
LNB Construction is a tenant improvement contractor. We take the commercial space you’ve leased, whether a bare shell or whatever the last tenant left behind, and build it into the business you signed the lease to open.
Twenty years. Over 250,000 square feet. Franchise programs, restaurants, retail, offices, medical and dental, in all fifty states. Headquarters in Katy, Texas.
Tenant improvement is the whole business, which is why we’re faster at it than the general contractor who does it between bigger jobs.

The scope depends on what the landlord delivered and what your business needs. Here is what we self-manage on a typical TI:












You have a brand book, an approved vendor list and a franchisor with an opening date on a spreadsheet. You need the space built to spec, not to a contractor’s interpretation of spec.
You’ve never done this before, you’re funded by an SBA loan, and you don’t know what a work letter is. That’s fine. We’ll read it and tell you what it actually means for your budget.
The landlord is contributing a tenant improvement allowance and wants documentation before they release it. We bill on AIA G702/G703, which is the format they’re expecting.
You’re moving from 4,000 square feet to 11,000 and you need the new space finished before the old lease ends.
Tenant improvement work looks small on paper and behaves like anything but. The constraints are what make it hard:
Working hours are restricted. Freight elevators are booked. The roof isn’t yours to penetrate without the landlord’s written consent, and if you find out about that in week six, you’ve lost two weeks.
Most tenants start paying rent before they start earning revenue. Every week we save is a week of rent you’re not paying on a closed business. That’s the metric we manage to.
Not framing. Not finishes. Getting a complete drawing set through plan review in a jurisdiction that has its own habits. We build the schedule backwards from permit issuance, and we submit complete the first time.
The landlord’s as-builts are ten years old. The panel doesn’t have the capacity the drawings claim. There’s an abandoned grease line under the slab. We find those things during the walkthrough and price them, instead of finding them in month two and issuing a change order.
No honest contractor gives you a number before walking the space. What we can tell you now is which four things will decide it.
The largest single factor. A cold dark shell means building HVAC, restrooms, ceilings, lighting and distribution from nothing. A good second-generation space means reusing most of it, if the layout suits you.
Every fixture is a supply, a waste line and often a slab cut. Fixtures in the middle of an existing slab cost far more than fixtures on an existing wet wall.
The gap between builder standard and brand standard premium is enormous, and it is the easiest place to overspend without noticing you have.
Energy code, accessibility triggers, sprinkler requirements, and how strict plan review is. The same build costs more in a high velocity hurricane zone than it does elsewhere.
Budget a contingency of 10 to 15 percent, closer to 20 on second-generation space. That line is not padding. It is the difference between finishing your project and running out of money at 85 percent.
Drag any handle. On the left, a space in the condition a landlord hands it over in. On the right, a finished interior a business can trade out of.

ShellFinished
ShellFinished
ShellFinishedWe read the lease and the work letter before we look at the space, then walk it against them. Most of what a TI costs is decided by what the landlord is not delivering.
A line-item number by trade against the delivered condition, with the exclusions listed. If the shell is short of what the work letter implies, you find out here.
Drawing set, submittal and the jurisdiction. On a straight TI this is usually the longest single item on the schedule, so we run it as the critical path.
Demo, framing, MEP rough-in, inspections, finishes and fixtures, sequenced around the landlord’s building rules and the hours your lease allows.
Punch closed before the final draw, then closeout documents, warranties, as-builts and the certificate of occupancy your landlord needs for rent commencement.
The part that matters is not the bid. It is whether the space opened when they said it would.
1 of 5
Real square footage, real timelines, real brands.
1 of 3
The same crews and the same schedule, on a different kind of space.
Next step
Send us the space and the brand standards. You'll get a walkthrough scheduled inside 48 hours and a real number. Not a range, not a “starting at.”
No obligation. No pressure. If we're not the right builder for your project, we'll tell you on the call.
info@lnbconstruction.netFinancing
Spread the cost over months or years with competitive rates and pre-qualification in minutes.