
We signed the lease in March and were serving customers in June. LNB walked the space with our drawings before we committed and told us exactly what the landlord's work letter did not cover.
Marisol Vega
Owner · Independent Cafe
By Service
Tenant Improvements
The landlord gave you a shell and an allowance. We turn it into your space.
Commercial Build Out Contractor
The same work, in the language most tenants use.
Tenant Finish Out Contractor
The Texas and Midwest term. Retail, restaurant, office and medical finish-outs.
Commercial Remodeling Contractor
Reworking space you already occupy, phased so you stay open.
Commercial Renovation Contractor
Bringing aging space up to current code and current standards.
Commercial General Contractor
Single-point contract, permits, trades, schedule and closeout.
By Space Type
Franchise Build-Outs
Your brand standard, built to spec, location after location.
Restaurant Build-Outs
Hoods, grease traps, health department, front of house. Open on schedule.
Retail Build-Outs
Storefront, fixtures, lighting, POS rough-in. Merchandise-ready.
Office Build-Outs
Class A finishes, demising walls, data, and a floor plan that actually works.
Medical & Med Spa Build-Outs
Treatment rooms, med gas, ventilation, ADA. Built to pass inspection first time.
Dental Office Build Out
Operatories, vacuum and air, imaging shielding, sterilization.
SBA-Funded Projects
7(a) and 504 draw schedules, and the documentation your lender releases money against.
AIA Billing (G702 / G703)
The certified payment application every bank, landlord and lender already knows how to read.
Our Process
Five stages, what you get at the end of each one, and what we need from you.
Financing
Spread the cost over months or years through our lending partners.
Guides
Costs, timelines and allowances, answered in plain language.
Where We Build
Headquartered in Katy, TX. Heaviest concentration across the Texas metros, and on site in all fifty states for multi-location programs.
On site in all fifty states. Don't see your city? Call us anyway.
All locationsServices
A dental office build out contractor has to land water, drain, air, vacuum, power and data in exact positions before the chairs go in. Move an operatory after that and you are opening the slab.
A dental build-out is a plumbing and equipment project. Every operatory needs water, drain, air, vacuum, power and data delivered to a precise location under the slab or in the wall, and once the chairs are set, moving any of it means breaking concrete.
LNB Construction builds dental practices. Startups, relocations, expansions and DSO rollouts. We coordinate with your equipment vendor from day one, because on a dental job the equipment drawings are the construction drawings.
Reception, business office, consult room, patient restroom to ADA, waiting area and a private doctor’s office round the plan out. None of that is where the money goes, and none of it is what decides the schedule.

Six areas. The first is repeated once per operatory, which is why operatory count moves a dental budget more than square footage does.
Dental construction has more parties than any other build-out of the same size, and the sequencing between them is the job.
You, the architect, the equipment vendor, the IT vendor, the practice management software provider, the shielding physicist, the general contractor and the landlord. Every one of them has a drawing that affects somebody else’s.
The vendor’s rough-in drawings drive the plumbing and the electrical. Nothing under the slab can be located without them.
If those drawings arrive late, or if they change after the slab is cut, the correction is concrete work rather than a revision.
Equipment rough-in drawings approved and frozen before we open the floor. Everything else is built around that date.
Almost every practice we build is financed, and the lender has opinions about paperwork long before it has opinions about construction.
SBA 7(a) or 504, or a practice-lending specialist. Those lenders release construction money in draws against documentation rather than on a schedule you set, so the documentation is part of the job.
AIA G702 and G703 certified payment applications with lien waivers from every tier, which is the format the lender is going to ask for whether or not anybody warned you.
Among the most expensive commercial categories per square foot, and the reason is not the finishes. It is that one room is repeated with full utilities each time.
Each operatory carries its own water, waste, air, vacuum, power and data run. A six-op practice costs meaningfully more per foot than a professional office the same size.
Whether utilities can be run in the walls or have to go under the floor. Cutting, trenching and repouring a slab is the difference between two very different numbers.
Lead-lined partitions and glazing designed to a physicist’s report, plus structural support for ceiling-mounted units and the inspection that follows.
Compressor and vacuum placement with real ventilation, heat rejection and acoustic treatment, and a casework package that is closer to cabinetry than to construction.
Most startups and expansions are financed by SBA 7(a), 504 or a practice lender. All of them release in draws against AIA billing, which is how we bill by default.
Drag any handle. On the left, a space in the condition a landlord hands it over in. On the right, a finished interior a business can trade out of.

ShellFinished
ShellFinished
ShellFinishedOne milestone governs everything: equipment rough-in drawings approved and frozen before we open the floor.
We walk it with your equipment vendor’s template rather than without it. Whether the utilities can reach your operatory layout is the entire question.
A line-item number built per operatory, so adding or removing an op moves a visible line rather than an opaque lump sum.
Drawings and permit, plus the shielding physicist’s report for imaging rooms and the state dental board facility requirements where they apply.
Nothing opens the floor until the equipment drawings are frozen. Then under-slab utilities, mechanical room, shielding, sterilization casework and finishes.
Punch, shielding inspection, and medical gas verification where nitrous is present, timed so the space is ready on your equipment install date rather than after it.
The part that matters is not the bid. It is whether the space opened when they said it would.
1 of 5
Real square footage, real timelines, real brands.
1 of 3
The same crews and the same schedule, on a different kind of space.
Next step
Send us the space and the brand standards. You'll get a walkthrough scheduled inside 48 hours and a real number. Not a range, not a “starting at.”
No obligation. No pressure. If we're not the right builder for your project, we'll tell you on the call.
info@lnbconstruction.netFinancing
Spread the cost over months or years with competitive rates and pre-qualification in minutes.