
We signed the lease in March and were serving customers in June. LNB walked the space with our drawings before we committed and told us exactly what the landlord's work letter did not cover.
Marisol Vega
Owner · Independent Cafe
By Service
Tenant Improvements
The landlord gave you a shell and an allowance. We turn it into your space.
Commercial Build Out Contractor
The same work, in the language most tenants use.
Tenant Finish Out Contractor
The Texas and Midwest term. Retail, restaurant, office and medical finish-outs.
Commercial Remodeling Contractor
Reworking space you already occupy, phased so you stay open.
Commercial Renovation Contractor
Bringing aging space up to current code and current standards.
Commercial General Contractor
Single-point contract, permits, trades, schedule and closeout.
By Space Type
Franchise Build-Outs
Your brand standard, built to spec, location after location.
Restaurant Build-Outs
Hoods, grease traps, health department, front of house. Open on schedule.
Retail Build-Outs
Storefront, fixtures, lighting, POS rough-in. Merchandise-ready.
Office Build-Outs
Class A finishes, demising walls, data, and a floor plan that actually works.
Medical & Med Spa Build-Outs
Treatment rooms, med gas, ventilation, ADA. Built to pass inspection first time.
Dental Office Build Out
Operatories, vacuum and air, imaging shielding, sterilization.
SBA-Funded Projects
7(a) and 504 draw schedules, and the documentation your lender releases money against.
AIA Billing (G702 / G703)
The certified payment application every bank, landlord and lender already knows how to read.
Our Process
Five stages, what you get at the end of each one, and what we need from you.
Financing
Spread the cost over months or years through our lending partners.
Guides
Costs, timelines and allowances, answered in plain language.
Where We Build
Headquartered in Katy, TX. Heaviest concentration across the Texas metros, and on site in all fifty states for multi-location programs.
On site in all fifty states. Don't see your city? Call us anyway.
All locationsServices
A restaurant build out contractor is judged on one date: the day you open with staff already hired. Rent started when you signed, and between you and that date sit the hood, the grease interceptor and the health department.
A restaurant build-out is not a retail build-out with a kitchen in it. It is a mechanical, plumbing and health-code project with a dining room attached, and the schedule is controlled by inspectors, not by drywall.
LNB Construction builds restaurants: QSR, fast casual, full service, coffee, bakery and ice cream. Hoods, grease, floor drains, walk-ins, health department, fire marshal, front of house.
Bars and taprooms, ghost kitchens, commissary space and food hall stalls run on the same rules, with a shorter list of them.

Nine systems, and the first four routinely account for more of the number than every finish in the building put together.
Three inspections, in this order, and none of them care about your marketing calendar.
Submitted before construction, not during. Health looks at equipment schedules, finish schedules, hand sinks, food flow and storage. Comments here can move walls.
Hood suppression, exit capacity, occupant load, extinguishers and emergency lighting.
After construction, before you serve. Everything has to be installed, running and clean, including equipment you might have planned to bring in later.
We build the schedule around inspector availability in your jurisdiction, because in most markets that is what actually sets the date. A crew that finishes early still waits.
The mechanical scope is what separates these from each other, and it separates them by a lot more than the menu does.
The tightest schedules and usually a franchisor behind them. Fixed opening dates, a prototype kitchen, and an equipment package that ships on a date somebody else set.
The largest front of house scope. Bar build, banquettes, acoustics, lighting design and restrooms sized for an occupant load that plan review will check.
Lighter on hood and heavier on plumbing, refrigeration and dedicated equipment power than people expect. Stella\u2019s Ice Cream in Phoenix was 2,200 square feet of exactly this.
Bars are a plumbing and glycol problem with a millwork package attached. Ghost kitchens and commissary space strip out the dining room and keep every inspection.
Mechanical, plumbing and equipment routinely make up more than half the construction cost before the equipment itself. Finishes are not what moves this number.
Whether the space already has a usable hood, an adequately sized grease interceptor and floor drains with slope. This one factor separates a cheap restaurant from an expensive one.
Gas load against your full equipment schedule, electrical service, and hot water demand a shell heater was never sized for. Meter upsizing has a lead time longer than construction.
A raw shell restaurant is among the most expensive commercial build-outs per square foot. A good second-generation space can be a fraction of it.
Not its price, its demands. Every piece drives a circuit, a drain, a gas run or a ventilation requirement, which is why the schedule is a construction document.
The most valuable hour you can spend is a walkthrough before you sign the lease. What is in the slab and on the roof decides your budget more than your design does, and we will look for free.
Drag any handle. The first is food and beverage: on the left the condition a landlord hands a space over in, on the right an interior a business can trade out of.

ShellFinished
ShellFinished
ShellFinishedSame five stages, with the schedule built around inspectors rather than trades. In most markets that is what actually sets your opening date.
We walk the roof and the slab before we look at the dining room. Hood route, grease interceptor size and existing floor drains decide more of this budget than anything else.
A line-item number with mechanical, plumbing and equipment broken out, because together they will outweigh every finish in the building.
Health department plan review before construction, then building, then fire. Health looks at equipment schedules, hand sinks, food flow and storage, and comments here move walls.
Rough-in, hood and make-up air, suppression, walk-ins and finishes, sequenced around inspector availability in your jurisdiction rather than around the trades.
Fire marshal, then the health department pre-opening inspection with everything installed, running and clean. Including the equipment you planned to bring in later.
The part that matters is not the bid. It is whether the space opened when they said it would.
1 of 5
Real square footage, real timelines, real brands.
1 of 3
The same crews and the same schedule, on a different kind of space.
Next step
Send us the space and the brand standards. You'll get a walkthrough scheduled inside 48 hours and a real number. Not a range, not a “starting at.”
No obligation. No pressure. If we're not the right builder for your project, we'll tell you on the call.
info@lnbconstruction.netFinancing
Spread the cost over months or years with competitive rates and pre-qualification in minutes.