We signed the lease in March and were serving customers in June. LNB walked the space with our drawings before we committed and told us exactly what the landlord's work letter did not cover.
Marisol Vega
Owner · Independent Cafe
By Service
Tenant Improvements
The landlord gave you a shell and an allowance. We turn it into your space.
Commercial Build Out Contractor
The same work, in the language most tenants use.
Tenant Finish Out Contractor
The Texas and Midwest term. Retail, restaurant, office and medical finish-outs.
Commercial Remodeling Contractor
Reworking space you already occupy, phased so you stay open.
Commercial Renovation Contractor
Bringing aging space up to current code and current standards.
Commercial General Contractor
Single-point contract, permits, trades, schedule and closeout.
By Space Type
Franchise Build-Outs
Your brand standard, built to spec, location after location.
Restaurant Build-Outs
Hoods, grease traps, health department, front of house. Open on schedule.
Retail Build-Outs
Storefront, fixtures, lighting, POS rough-in. Merchandise-ready.
Office Build-Outs
Class A finishes, demising walls, data, and a floor plan that actually works.
Medical & Med Spa Build-Outs
Treatment rooms, med gas, ventilation, ADA. Built to pass inspection first time.
Dental Office Build Out
Operatories, vacuum and air, imaging shielding, sterilization.
SBA-Funded Projects
7(a) and 504 draw schedules, and the documentation your lender releases money against.
AIA Billing (G702 / G703)
The certified payment application every bank, landlord and lender already knows how to read.
Our Process
Five stages, what you get at the end of each one, and what we need from you.
Financing
Spread the cost over months or years through our lending partners.
Guides
Costs, timelines and allowances, answered in plain language.
Where We Build
Headquartered in Katy, TX. Heaviest concentration across the Texas metros, and on site in all fifty states for multi-location programs.
On site in all fifty states. Don't see your city? Call us anyway.
All locationsServices
A commercial build out contractor turns a shell, or whatever the last tenant walked away from, into a space you can open in. The framing is never the hard part. The permit, the landlord's work letter and getting trades on site in the right order are what decide your opening date.
A commercial build out is the interior construction that turns leased space into a working business. LNB does that, and only that, in all fifty states.
If you’ve got a shell, a set of brand standards or a floor plan, and a date you need to be open by, that’s the job. We price it line by line, permit it, build it, and hand it over with the certificate of occupancy in your hand.
We don’t pour foundations and we don’t build subdivisions. Interior work in leased space is the whole business, which is why you get a line-item bid instead of a range, one project manager instead of a rotating cast, and a schedule built backwards from the date your permit is issued.

People use the phrase to mean three different things. Here is what a landlord, a broker and a contractor each mean, so you know which one you are buying. Most of our work is warm shell and second generation, and both of those hide surprises. The walkthrough is where we find them.




Every trade broken out on a schedule of values. You can see exactly where the money goes, which means you can also see what to cut if you need to.
Panel capacity, existing plumbing, slab conditions, roof rights, ADA path of travel from the parking lot. Those get inspected during the walkthrough and priced into the bid, not issued as change orders in month two.
Not a rotating cast. The person who walked the space with you is the person who calls you every week.
AIA G702 and G703 certified payment applications. Whether the money is coming from an SBA lender, a bank construction loan, or a landlord’s TI allowance, they all know how to read those forms and they all release faster when they get them.
Per square foot is the wrong unit and everyone uses it anyway. Four things move the number more than the size of the space does.
Cold dark shell, warm lit shell or second generation. The difference between the first and the last is most of the budget, and it is decided by the lease rather than by you.
Hoods, make-up air, medical gas, vacuum and dedicated exhaust. This is why a restaurant or a dental practice costs a multiple of a retail store of the same size.
Small spaces cost more per foot, not less. General conditions, mobilisation, permits and supervision do not shrink in proportion to the floor plate.
Overtime, weekend work and expedited materials are all buyable. A compressed schedule can add 10 to 20 percent, and it is worth knowing that before you promise a date.
Things people forget entirely: design and engineering fees, permit and impact fees, furniture and equipment, IT and cabling, signage and its permit, and a contingency.
Drag any handle. On the left, a space in the condition a landlord hands it over in. On the right, a finished interior a business can trade out of.

ShellFinished
ShellFinished
ShellFinishedWe walk it with you and read the work letter. You get a written scope with the exclusions listed plainly, which is the document most disagreements later turn on.
A line-item number by trade. Not a range, not a square-foot rule of thumb, and every allowance stated as an allowance rather than buried as a price.
Drawing set, submittal, plan review comments and the permit. Permitting is the single most common reason a build-out slips, so it is treated as the critical path.
Demo through fixtures, with a weekly written report and photographs. One project manager and one phone number the whole way through.
We walk the list with you and close it before we ask for the final draw. Closeout documents, warranties, as-builts and the certificate of occupancy.
The part that matters is not the bid. It is whether the space opened when they said it would.
1 of 5
Real square footage, real timelines, real brands.
1 of 3
The same crews and the same schedule, on a different kind of space.
Next step
Send us the space and the brand standards. You'll get a walkthrough scheduled inside 48 hours and a real number. Not a range, not a “starting at.”
No obligation. No pressure. If we're not the right builder for your project, we'll tell you on the call.
info@lnbconstruction.netFinancing
Spread the cost over months or years with competitive rates and pre-qualification in minutes.