
We signed the lease in March and were serving customers in June. LNB walked the space with our drawings before we committed and told us exactly what the landlord's work letter did not cover.
Marisol Vega
Owner · Independent Cafe
By Service
Tenant Improvements
The landlord gave you a shell and an allowance. We turn it into your space.
Commercial Build Out Contractor
The same work, in the language most tenants use.
Tenant Finish Out Contractor
The Texas and Midwest term. Retail, restaurant, office and medical finish-outs.
Commercial Remodeling Contractor
Reworking space you already occupy, phased so you stay open.
Commercial Renovation Contractor
Bringing aging space up to current code and current standards.
Commercial General Contractor
Single-point contract, permits, trades, schedule and closeout.
By Space Type
Franchise Build-Outs
Your brand standard, built to spec, location after location.
Restaurant Build-Outs
Hoods, grease traps, health department, front of house. Open on schedule.
Retail Build-Outs
Storefront, fixtures, lighting, POS rough-in. Merchandise-ready.
Office Build-Outs
Class A finishes, demising walls, data, and a floor plan that actually works.
Medical & Med Spa Build-Outs
Treatment rooms, med gas, ventilation, ADA. Built to pass inspection first time.
Dental Office Build Out
Operatories, vacuum and air, imaging shielding, sterilization.
SBA-Funded Projects
7(a) and 504 draw schedules, and the documentation your lender releases money against.
AIA Billing (G702 / G703)
The certified payment application every bank, landlord and lender already knows how to read.
Our Process
Five stages, what you get at the end of each one, and what we need from you.
Financing
Spread the cost over months or years through our lending partners.
Guides
Costs, timelines and allowances, answered in plain language.
Where We Build
Headquartered in Katy, TX. Heaviest concentration across the Texas metros, and on site in all fifty states for multi-location programs.
On site in all fifty states. Don't see your city? Call us anyway.
All locationsServices
A commercial renovation contractor gets called when the lighting is on its second decade, the restrooms no longer meet current ADA, and the finishes are telling your customers something you did not intend to say.
The lighting is on its second decade, the restrooms don’t meet current ADA, the HVAC is at end of life, and the finishes are telling your customers something you didn’t intend.
LNB Construction renovates commercial interiors. We bring aging space back up to current code, current standards and current expectations, in occupied buildings, phased so the business keeps operating.
Most renovations we price are triggered by one specific thing: an accessibility complaint, a failed inspection, a lease renewal, or a landlord finally agreeing to spend. Whatever started it, the survey is the same.

Six areas, and a renovation almost never touches only one of them. Opening a ceiling for lighting tends to find the fire alarm, and correcting a restroom tends to find the corridor.






Renovation budgets get broken by a short list of things, and every one of them is discoverable before construction starts if somebody bothers to look.
Renovating triggers ADA obligations on the areas you touch and, past certain thresholds, on the path of travel to them. A restroom renovation can pull in the corridor, the entry door and the parking stall. We survey this at the walkthrough.
Asbestos-containing floor tile and mastic in anything built before the late 1980s. Undersized electrical service. Cast iron waste lines at end of life. Structural conditions above the ceiling nobody has looked at since the building went up. On anything over about thirty years old we recommend selective investigative demo before we price.
Energy code, seismic and wind provisions, and fire code have all moved. A building that was legal when it was built may need work in areas you were not planning to open.
It makes for a less pleasant first meeting and a considerably better project. None of the three above is a surprise if somebody looks, and looking is cheap compared to finding out in month two.
Renovation budgets are broken by what nobody looked at. All four of these are discoverable before construction starts.
Asbestos-containing floor tile and mastic in anything pre-1990, undersized electrical service, cast iron waste at end of life, and whatever is above the ceiling.
Renovating an area obliges that area to comply, and past certain thresholds the path of travel to it as well. A restroom can pull in the corridor, the entry door and a parking stall.
Lighting, HVAC, panels and plumbing. Replacing one often obliges you to bring the others up to current code, which is a scope decision rather than a preference.
Containment, negative air, protected egress and after-hours work are real line items. A vacant building renovates considerably cheaper than a working one.
On anything over about thirty years old, we would rather price selective investigative demo first than hand you a number built on assumptions.
Drag any handle. On the left, a space in the condition a landlord hands it over in. On the right, a finished interior a business can trade out of.

ShellFinished
ShellFinished
ShellFinishedWe walk it looking for what the drawings will not show: floor tile of a certain age, undersized service, cast iron waste, and conditions nobody has seen since the building went up.
On an older building we price investigative demo first and the work second. A number built on assumptions about a 1970s building is a guess with a decimal point.
Drawings and permit, with the code cycle catch-up named up front. Energy, wind and fire provisions have all moved, and a building legal when built may need work you were not planning.
Abatement first where it is required, by a licensed firm with independent clearance, then systems, then finishes. Containment throughout if the building is occupied.
Punch, final inspections and closeout, including the abatement and accessibility documentation, which is the paperwork somebody asks for two years later.
The part that matters is not the bid. It is whether the space opened when they said it would.
1 of 5
Real square footage, real timelines, real brands.
1 of 3
The same crews and the same schedule, on a different kind of space.
Next step
Send us the space and the brand standards. You'll get a walkthrough scheduled inside 48 hours and a real number. Not a range, not a “starting at.”
No obligation. No pressure. If we're not the right builder for your project, we'll tell you on the call.
info@lnbconstruction.netFinancing
Spread the cost over months or years with competitive rates and pre-qualification in minutes.