Skip To Content
LNB Construction

We Build Out The Space You Just Leased.

Tenant improvements, franchise build-outs and commercial finish-outs. You hand us an empty shell and a brand standard. We hand you back a business that's ready to open.

Katy, Texas HQ. On site in all fifty states.

  • Licensed Texas General Contractor
  • Bonded & Insured
  • Workers’ Comp Carried
  • BBB Accredited A+
  • NARI Member
  • On Site In All 50 States
  • Escrow Services Available
Commercial floor plans, a scale rule and drafting pens on a desk

Who You Are Actually Hiring

Most commercial contractors treat tenant improvement as the small work they take between real jobs. It sits at the bottom of a services list under “ground-up” and “civil” and “design-build.”

That's not us. Building out commercial space is the business, not the filler between bigger ones. Twenty years of it. Franchise programs where we've built the same brand in five states and the fixtures land in the same place every time.

That focus is worth something specific to you: we've already solved your problem. The grease interceptor the city wants that isn't in your landlord's drawings. The med gas inspection that adds three weeks if you schedule it wrong. The franchisor's fixture package that ships six weeks out and needs a slab poured before it arrives. We've hit all of it before, on somebody else's job, and we've stopped it from becoming your delay.

You're not hiring a general contractor who also does build-outs. You're hiring a build-out contractor.

How A Build-Out Works

Five stages. You'll know which one you're in at all times, and you'll know what's happening next.

  1. Walkthrough And Scope

    We walk the space with you, read the lease, the landlord's work letter and the brand standards, and give you a written scope of exactly what's included, and more importantly what isn't.

  2. Budget And Bid

    A line-item number, not a range. Every trade broken out. If something in the space is going to cost more than you expected, you find out here, not in month three.

  3. Permits And Drawings

    We handle the drawing set, the submittal and the jurisdiction. Permitting is the single most common reason build-outs slip. We treat it as the critical path, because it is.

  4. Construction

    Demo, framing, MEP rough-in, inspections, finishes, fixtures. Weekly written updates with photos. One project manager, one phone number, the whole way through.

  5. Punch List And Handover

    We walk it with you and fix the list before we ask for the final draw. You get closeout documents, warranties, as-builts and the certificate of occupancy. Then you open.

Don't Take Our Word. Here Is Our Work.

Brands we have built for, from single storefronts to multi-unit franchise programs.

1 of 5

From Empty Shell To Open Doors

Drag any handle. On the left, a space in the condition a landlord hands it over in. On the right, a finished interior a business can trade out of.

A bare shell with exposed black ceiling services, stud partitions going up and a concrete floorThe finished IV therapy lounge with rows of treatment recliners, a wall-mounted display, a teal feature wall and polished concreteShellFinished
IV Therapy Lounge
An empty bay with a roll-up door, bare concrete and construction debris on the floorThe finished bay with checkered floor tile, painted banding, lighting and a tool wallShellFinished
Automotive Bay

The Kinds Of Space We Build Out

If it's leased, interior, and commercial, it's in our lane. See every service.

What Owners Say Afterwards

The part that matters is not the bid. It is whether the space opened when they said it would.

We signed the lease in March and were serving customers in June. LNB walked the space with our drawings before we committed and told us exactly what the landlord's work letter did not cover.

Marisol Vega

Owner · Independent Cafe

Our lender wanted G702s and a schedule of values, not a lump sum. LNB billed the way the bank expected from the first draw, so nothing stalled in underwriting.

Dev Ramaswamy

Franchisee · Fitness Franchise

Four units in three states and every one of them looks like the prototype. That is the part I could never get from hiring a different contractor in each market.

Alicia Brenner

Director of Development · Multi-Site Retail Brand

One superintendent, one number to call, weekly progress against the schedule. We were paying rent on a dark store and they knew it.

Tomasz Kowal

Managing Partner · Retail Group

The permit run in our jurisdiction is where these projects usually die. They tracked it and told us where it sat every week instead of going quiet.

Renée Okafor

Practice Manager · Dental Practice

1 of 5

Built For Franchise Programs

If you're a franchisee, you don't need a contractor who can build a store. You need one who can build your store , the way the brand book says, with the approved vendors, on the timeline your franchisor's opening schedule assumes.

We've run multi-location programs for Tint World and Happy Cat Hotel. Same drawings, same fixture standards, different jurisdictions and different landlords every time. The value isn't that we can read a brand manual. It's that by location three, we know where your franchisor's spec and the local code are going to disagree, and we've already got the answer.

Franchise build-outs

SBA Funding And AIA Billing

Most first-location owners are building on borrowed money. That changes how a construction job has to be run.

If you're funded by an SBA 7(a) or 504 loan, your lender releases money in draws, and each draw needs documentation they'll accept. We bill on AIA G702 and G703 forms, the standard certified payment application every bank, landlord and lender in the country already knows how to read.

That's not a small thing. A contractor who can't produce a clean G703 schedule of values will hold up your draw, and a held-up draw holds up your build.

SBA-funded projectsHow AIA billing works

Questions People Ask Before They Call

What exactly is a tenant improvement?
It’s the interior construction that turns leased commercial space into a usable business. Walls, ceilings, flooring, electrical, plumbing, HVAC distribution, lighting, millwork and finishes. The landlord delivers a shell or a previous tenant’s leftovers. The tenant improvement is everything between that and opening day.
Do you work outside Texas?
Yes. Katy, Texas is our headquarters, and Texas is where we do the most work, but we’ve been on site in all fifty states. Multi-location franchise programs are a big part of what we do, and those don’t stay inside one state.
How much does a build-out cost per square foot?
It depends on the space type and how much the landlord’s shell already includes. Restaurants and medical are the most expensive per foot because of the mechanical work. Open retail is the least. On a real project you’ll get a line-item number, not a range. Read the cost guide.
How long does a build-out take?
Most of ours run 10 to 20 weeks from permit to open, and permitting is usually the variable, not construction. A 2,000 sq ft retail space in a cooperative jurisdiction can be quicker. A restaurant or a dental office with heavy mechanical will be longer. Full timeline breakdown.
Can you work with my tenant improvement allowance?
Yes, and we’re used to it. We’ll read the landlord’s work letter, tell you honestly what the allowance actually covers, and bill in the format the landlord needs to release it. More on TI allowances.
Are you licensed and insured?
Licensed Texas general contractor, bonded, general liability and workers’ compensation carried, BBB accredited A+, NARI member. We’ll send certificates before you sign anything.
What kinds of projects do you take?
Commercial work. Tenant improvements, build-outs and finish-outs are the core of it, plus remodels and renovations. Tell us what the space is and what you need it to become, and we’ll tell you straight whether it’s a fit.

Next step

You Signed The Lease. Let’s Get It Open.

Send us the space and the brand standards. You’ll get a walkthrough scheduled inside 48 hours and a real number. Not a range, not a “starting at.”

No obligation. No pressure. If we're not the right builder for your project, we'll tell you on the call.

info@lnbconstruction.net

Financing

Financing Available Through Trusted Partners

Spread the cost over months or years with competitive rates and pre-qualification in minutes.