Stella's Ice Cream

Stella's Ice Cream needed a 2,200 sq ft inline suite in the Phoenix market turned into an ice cream shop: a retail counter, custom freezer bays and a back kitchen. LNB built it in 9 weeks, and the photographs below follow the job from bare suite to finished counter.

  • Licensed Texas General Contractor
  • Bonded & Insured
  • Workers’ Comp Carried
  • BBB Accredited A+
  • NARI Member
  • On Site In All 50 States
  • Escrow Services Available

Project Snapshot

Ice cream shop
Client
Phoenix, AZ
Market
2,200
Square feet
9 weeks
Build duration

Scope: retail, custom freezer bays and back kitchen.

What We Built

Room by room, as the photographs further down show it.

Serving Counter And Dipping Cases

A long serving counter with a run of glass-fronted dipping cabinets, a menu board across the back wall and drum pendants over the line. The dipping cases each need a dedicated circuit and a place for their heat to go.

Custom Freezer Bays

Custom freezer bays are on LNB's scope line for this job. Freezer equipment sets the electrical load, the condensate and drainage runs and the floor build-up, so on any job like this it is laid out before anything else is.

Back Kitchen

A separate back room, tiled in blue to the wainscot and reached through a door off the brand wall.

Brand Wall And Restroom

A pink feature wall with dimensional script lettering and a cone artwork, an arched niche, and an accessible restroom with grab bars, a blue tile wainscot and the brand's sprinkle-pattern wallcovering above it.

The Job, In Order

Stella's is the one project here where LNB photographed the whole arc. The suite starts with a bare concrete slab, patched walls and plumbing stubbed up through the floor. Then the new walls go up and get primed, with an arched niche framed in. Pendants and table bases follow, with the dipping cases still wrapped. Then the brand wall is lettered, the counter is finished, and the restroom is tiled and fitted.

On Site

9 of LNB's own photographs of this job. Click any one to open it full size. The comparison tile is the same room before and after: drag its handle.

Stella's Ice Cream Phoenix storefront in daylight with channel-letter sign and yellow patio chairsafter
The finished storefront in daylight, patio seating out front.
A shell mid fit-out with exposed ductwork, taped drywall, subway tile going up along one wall and a tarp over the counter runThe finished ice cream shop with a timber service counter, dipping cabinets, a painted menu wall, pendant lighting and polished terrazzoShellFinished
Ice Cream Shop
The same room on this job, before and after.
Stella's Ice Cream storefront at night with blue illuminated sign and lit pink interiorafter
At night the sign lights blue and the pink interior shows through the glass.
Stella's Ice Cream storefront at dusk with open sign litafter
Open for business at dusk.
Stella's Ice Cream suite before build-out: bare concrete slab, patched walls and plumbing stubbed through the floorbefore
Early on: bare slab, patched walls, and plumbing stubbed up through the floor.
Stella's Ice Cream during construction: primed walls, framed arched niche and scaffoldduring
New walls primed, with the arched niche framed in. Scaffold still up.
Stella's Ice Cream during construction: pendant lights hung, table bases on the floor, dipping cases still wrappedduring
Pendants hung, table bases on the floor, equipment still wrapped.
Stella's Ice Cream pink brand wall with script lettering and cone artwork, door to tiled back roomduring
The brand wall lettered, and the door through to the tiled back of house.
Stella's Ice Cream finished serving counter with dipping cabinets, menu board and drum pendantsafter
The finished serving counter, dipping cabinets in, menu board up.
Stella's Ice Cream accessible restroom with grab bars, blue tile wainscot and sprinkle wallcoveringafter
The accessible restroom: grab bars, blue tile wainscot, sprinkle wallcovering.

Build Something Like This

This work as the service that produced it, the market it was built in, and the guides that price and plan a job like it.

Next step

You Signed The Lease. Let’s Get It Open.

Send us the space and the brand standards. You’ll get a walkthrough scheduled inside 48 hours and a real number. Not a range, not a “starting at.”

No obligation. No pressure. If we're not the right builder for your project, we'll tell you on the call.

Questions first? Read the build-out FAQ

info@lnbconstruction.net

Financing

Financing Available Through Trusted Partners

Spread the cost over months or years with competitive rates and pre-qualification in minutes.