
We signed the lease in March and were serving customers in June. LNB walked the space with our drawings before we committed and told us exactly what the landlord's work letter did not cover.
Marisol Vega
Owner · Independent Cafe
By Service
Tenant Improvements
The landlord gave you a shell and an allowance. We turn it into your space.
Commercial Build Out Contractor
The same work, in the language most tenants use.
Tenant Finish Out Contractor
The Texas and Midwest term. Retail, restaurant, office and medical finish-outs.
Commercial Remodeling Contractor
Reworking space you already occupy, phased so you stay open.
Commercial Renovation Contractor
Bringing aging space up to current code and current standards.
Commercial General Contractor
Single-point contract, permits, trades, schedule and closeout.
By Space Type
Franchise Build-Outs
Your brand standard, built to spec, location after location.
Restaurant Build-Outs
Hoods, grease traps, health department, front of house. Open on schedule.
Retail Build-Outs
Storefront, fixtures, lighting, POS rough-in. Merchandise-ready.
Office Build-Outs
Class A finishes, demising walls, data, and a floor plan that actually works.
Medical & Med Spa Build-Outs
Treatment rooms, med gas, ventilation, ADA. Built to pass inspection first time.
Dental Office Build Out
Operatories, vacuum and air, imaging shielding, sterilization.
By Property Type
For owners, asset managers and property managers running capex on property that is already leased and still occupied.
SBA-Funded Projects
7(a) and 504 draw schedules, and the documentation your lender releases money against.
AIA Billing (G702 / G703)
The certified payment application every bank, landlord and lender already knows how to read.
Our Process
Five stages, what you get at the end of each one, and what we need from you.
Financing
Spread the cost over months or years through our lending partners.
Guides
Costs, timelines and allowances, answered in plain language.
Where We Build
Headquartered in Katy, TX. Heaviest concentration across the Texas metros, and on site in all fifty states for multi-location programs.
On site in all fifty states. Don't see your city? Call us anyway.
All locationsServices
Unit turns, interior upgrades, common areas, amenities and exteriors, done at scale, phased around residents who never moved out, and billed against your capex budget in a format your lender already reads.
LNB Construction renovates existing multifamily property: unit interiors and turns, common areas, amenity space, and building exteriors. Interior and envelope work at scale, phased around occupied buildings and billed on AIA against a capex budget, is the same muscle as the tenant improvement work that is the rest of this business.
You are not opening a store on a date. You are running a capex budget, a renovation schedule across a rent roll, and an occupancy number you cannot let slip while the work is live. Days per turn is the metric, because every extra day is rent nobody collected.
We renovate and improve property that is already standing and already leased. We do not build ground-up multifamily, and we will say so on the first call rather than three weeks into a bid.
Four scopes. Most owners hire us for one and end up giving us the other three.
A one-off unit renovation is a job. Two hundred and forty of them is a system, and the difference between a good multifamily contractor and a bad one is entirely in the system.
This is the scope with the best return per dollar in multifamily, and the one most owners defer longest.
A prospect decides how they feel about your property in the walk from the parking lot to the leasing office. If that walk goes through a dated lobby, a corridor with worn carpet, and a fitness room with equipment from two owners ago, the unit has to do all the work by itself.
We phase amenity work so the property never loses every amenity at once. If the fitness centre is down, the clubhouse is open. Residents notice, and renewal season is closer than you think.
Multifamily exterior renovation is usually two problems at once: the property looks tired, and something has been leaking for a while.
We handle both in one mobilisation. Siding and stucco, painting, balconies and railings, breezeways and stair systems, entry doors, exterior lighting, signage and monument work, and roofing coordinated with your roofer or ours.
The reason to do it as one package rather than four separate vendor engagements: one set of swing stages, lifts and scaffolding, one set of resident notices, one traffic plan, one punch walk. Mobilisation is a real cost in multifamily, and paying it four times is the most common avoidable expense in a capex plan.
This is the whole job, and it is where most contractors lose properties.
A resident who cannot park, cannot sleep, or cannot get to their door is a renewal you just lost, and a review that costs you the next three leases. The construction is not the hard part. Running construction through somebody’s home without them hating you is the hard part.
We put the phasing plan and the resident communication plan in writing before we mobilise, and your property manager approves it before a single notice goes up.
Multifamily capex has to survive a budget review, so the paperwork matters as much as the work.
Fixed scope, fixed price per unit type. Predictable, easy to model, and easy to defend upward.
Common area, amenity and exterior scopes are priced by trade on a schedule of values, so you can see what to cut if the budget moves.
Certified payment applications with lien waivers from every tier, in the format your lender, your investor and your asset manager already know how to read.
How AIA billing worksBridge loan, renovation reserve, escrowed capex budget or a value-add fund’s project account. We bill to the schedule the money actually releases on.
Monthly reporting on one page: units complete, units in progress, days per turn against commitment, spend to date against budget, and anything threatening the schedule.
Commercial interiors rather than apartments, because that is the work we have photographed. Drag any handle. The scope on a unit turn is the same list: flooring, cabinets, counters, fixtures, lighting and paint.

ShellFinished
ShellFinished
ShellFinishedWe walk a sample of each unit type with your regional and your on-site team, and read the capex budget the same way we read a work letter. You get a written scope per unit type with the exclusions stated plainly.
A fixed price per unit type, and a line-item schedule of values for the common area, amenity and exterior scopes. If the scope you have budgeted will not produce the unit you are describing, you find out here.
Turn work is usually permit-light and amenity and exterior work usually is not. We separate the two so units start turning while the clubhouse is still in plan review.
Phased by building or stack against your notice-to-vacate list, resident notices out ahead of the work, access kept open, and the site cleaned every day.
One punch standard, walked before a unit goes back to leasing, and monthly reporting on units complete, days per turn against commitment, and spend against budget.
The part that matters is not the bid. It is whether the space opened when they said it would.
1 of 5
Real square footage, real timelines, real brands.
1 of 3
The same crews and the same schedule, on a different kind of space.
Headquartered in Katy, Texas, on site in all fifty states.
The cities below have pages of their own. An unlisted market is not a no. See every market we work in.
Next step
Send us the address, the unit count and the scope you have in mind. You will get a walkthrough scheduled inside 48 hours and a per-unit number after it, not a range.
No obligation. No pressure. If we're not the right builder for your project, we'll tell you on the call.
info@lnbconstruction.netFinancing
Spread the cost over months or years with competitive rates and pre-qualification in minutes.