We signed the lease in March and were serving customers in June. LNB walked the space with our drawings before we committed and told us exactly what the landlord's work letter did not cover.
Marisol Vega
Owner · Independent Cafe
By Service
Tenant Improvements
The landlord gave you a shell and an allowance. We turn it into your space.
Commercial Build Out Contractor
The same work, in the language most tenants use.
Tenant Finish Out Contractor
The Texas and Midwest term. Retail, restaurant, office and medical finish-outs.
Commercial Remodeling Contractor
Reworking space you already occupy, phased so you stay open.
Commercial Renovation Contractor
Bringing aging space up to current code and current standards.
Commercial General Contractor
Single-point contract, permits, trades, schedule and closeout.
By Space Type
Franchise Build-Outs
Your brand standard, built to spec, location after location.
Restaurant Build-Outs
Hoods, grease traps, health department, front of house. Open on schedule.
Retail Build-Outs
Storefront, fixtures, lighting, POS rough-in. Merchandise-ready.
Office Build-Outs
Class A finishes, demising walls, data, and a floor plan that actually works.
Medical & Med Spa Build-Outs
Treatment rooms, med gas, ventilation, ADA. Built to pass inspection first time.
Dental Office Build Out
Operatories, vacuum and air, imaging shielding, sterilization.
SBA-Funded Projects
7(a) and 504 draw schedules, and the documentation your lender releases money against.
AIA Billing (G702 / G703)
The certified payment application every bank, landlord and lender already knows how to read.
Our Process
Five stages, what you get at the end of each one, and what we need from you.
Financing
Spread the cost over months or years through our lending partners.
Guides
Costs, timelines and allowances, answered in plain language.
Where We Build
Headquartered in Katy, TX. Heaviest concentration across the Texas metros, and on site in all fifty states for multi-location programs.
On site in all fifty states. Don't see your city? Call us anyway.
All locationsHow We Work
Five stages. You'll know which one you're in at all times, and you'll know what's happening next.
Every job runs in this order. What changes between a dental practice and a coffee shop is what happens inside each stage, not the stages themselves.
We walk the space with you, read the lease, the landlord's work letter and the brand standards, and give you a written scope of exactly what's included, and more importantly what isn't.
What You Get
A written scope of work with the exclusions listed plainly, so the things nobody is buying are on paper before anybody has spent money.
What We Need From You
The lease or the landlord’s work letter, any drawings you have even if it is only a broker’s floor plan, and brand standards if you are a franchisee.
A line-item number, not a range. Every trade broken out. If something in the space is going to cost more than you expected, you find out here, not in month three.
What You Get
A line-item budget by trade and a schedule of values, in the format your lender or property manager will ask for it in.
What We Need From You
Decisions on anything we have had to carry as an allowance, and your target opening date so we can price against it honestly.
We handle the drawing set, the submittal and the jurisdiction. Permitting is the single most common reason build-outs slip. We treat it as the critical path, because it is.
What You Get
A complete permit set submitted, plan review comments answered, and the submittal tracked so you know where it sits rather than hearing nothing for six weeks.
What We Need From You
Stamped architectural and engineering drawings where the jurisdiction requires them, and your signature on the permit application as the tenant.
Demo, framing, MEP rough-in, inspections, finishes, fixtures. Weekly written updates with photos. One project manager, one phone number, the whole way through.
What You Get
A weekly written report with photographs, and a monthly AIA payment application with the lien waiver package behind it.
What We Need From You
Selections made on time, and your approval on any change order before the work happens rather than after it appears on a bill.
We walk it with you and fix the list before we ask for the final draw. You get closeout documents, warranties, as-builts and the certificate of occupancy. Then you open.
What You Get
Closeout documents, warranties, as-builts, final unconditional lien waivers and the certificate of occupancy.
What We Need From You
A walk of the finished space with us, and your punch list. We close it before we ask for the final draw, not after.
You are paying rent on a space that is not open yet. Knowing where it stands is not a nice-to-have.
One name and one phone number for the length of the job. Not a rota, and not a different person every time something goes wrong.
What got done, what is next, what is late and why. In writing, so you can forward it to a landlord or a lender without translating it first.
Especially if you are out of state. Progress you can see beats progress somebody describes to you on a call.
Not a project manager on a phone. Remote-managed construction is how a brand standard quietly turns into a suggestion.
The five stages hold. What moves is which one owns the critical path, and that is decided by what you are building.
The part that matters is not the bid. It is whether the space opened when they said it would.
1 of 5
Next step
Send us the space and the brand standards. You'll get a walkthrough scheduled inside 48 hours and a real number. Not a range, not a “starting at.”
No obligation. No pressure. If we're not the right builder for your project, we'll tell you on the call.