
We signed the lease in March and were serving customers in June. LNB walked the space with our drawings before we committed and told us exactly what the landlord's work letter did not cover.
Marisol Vega
Owner · Independent Cafe
By Service
Tenant Improvements
The landlord gave you a shell and an allowance. We turn it into your space.
Commercial Build Out Contractor
The same work, in the language most tenants use.
Tenant Finish Out Contractor
The Texas and Midwest term. Retail, restaurant, office and medical finish-outs.
Commercial Remodeling Contractor
Reworking space you already occupy, phased so you stay open.
Commercial Renovation Contractor
Bringing aging space up to current code and current standards.
Commercial General Contractor
Single-point contract, permits, trades, schedule and closeout.
By Space Type
Franchise Build-Outs
Your brand standard, built to spec, location after location.
Restaurant Build-Outs
Hoods, grease traps, health department, front of house. Open on schedule.
Retail Build-Outs
Storefront, fixtures, lighting, POS rough-in. Merchandise-ready.
Office Build-Outs
Class A finishes, demising walls, data, and a floor plan that actually works.
Medical & Med Spa Build-Outs
Treatment rooms, med gas, ventilation, ADA. Built to pass inspection first time.
Dental Office Build Out
Operatories, vacuum and air, imaging shielding, sterilization.
SBA-Funded Projects
7(a) and 504 draw schedules, and the documentation your lender releases money against.
AIA Billing (G702 / G703)
The certified payment application every bank, landlord and lender already knows how to read.
Our Process
Five stages, what you get at the end of each one, and what we need from you.
Financing
Spread the cost over months or years through our lending partners.
Guides
Costs, timelines and allowances, answered in plain language.
Where We Build
Headquartered in Katy, TX. Heaviest concentration across the Texas metros, and on site in all fifty states for multi-location programs.
On site in all fifty states. Don't see your city? Call us anyway.
All locationsServices
A commercial remodeling contractor is who you call when you do not need a new space, you need the one you are in to stop working against you, and you need to stay open while it happens.
Sometimes you don’t need a new space. You need the one you’re in to stop working against you.
LNB Construction remodels commercial interiors: offices that no longer fit how the team works, retail that looks a decade old, restaurants due for a brand refresh, medical suites adding operatories.
We do it in vacant space, and we do it in occupied space where the business has to keep running while we work. Most of ours are the second kind, which is a different job from building into an empty unit and priced like one.

Six kinds of remodel and the scope that usually comes with each. Nearly all of it can be phased around a business that is still trading.






This is the part most contractors handle badly. Remodeling an occupied business is a logistics problem before it is a construction problem.
The work is broken into zones so the parts of the business that generate revenue keep generating it. You approve the phasing plan before we mobilise, not after the first wall comes down.
Nights, weekends and early mornings where the schedule needs it and the lease allows it. That costs more per hour and less per week of lost revenue, and we show you both numbers so the choice is yours to make.
Temporary partitions, negative air where dust matters, protected paths of travel and a daily clean-down. In medical space, infection-control containment to the standard the practice is held to.
Egress, fire separation and ADA access have to stay compliant during construction, not only after it. That gets planned in the phasing rather than improvised on the day an inspector walks in.
Worth being honest about, because sometimes the answer is relocate and we will say so. You will know which one you are looking at during the walkthrough, before either of us has spent money.
The location is right, the lease has term left, the building works, and the problem is layout or finishes rather than square footage or mechanical systems at the end of their life.
You have outgrown the square footage, the mechanical systems are finished, or the landlord will not invest. No amount of interior work fixes any of those three.
Relocating buys you moving expense, downtime, new signage, an address change on everything you have ever printed, and a build-out at the other end anyway. That last item is the one people leave out of the comparison.
In many jurisdictions, once a remodel exceeds a percentage of the building’s value you trigger full-code compliance on systems you were not planning to touch. We flag that at the walkthrough, because it moves a budget further than any finish selection will.
Less per square foot than a full build-out, because the infrastructure is already there. The range is wide, and these four decide where in it you land.
Phasing, containment and after-hours work cost more per hour and less per week of lost revenue. We price both so the trade is yours to make rather than ours.
A cosmetic refresh is a fraction of a reconfiguration that relocates plumbing and walls. Paint and flooring are cheap. Moving a wet wall is not.
Past a percentage of building value, a remodel triggers full-code compliance on systems you were not planning to touch. That single line can outweigh every finish in the job.
Second-generation space hides undersized service, aging waste lines and conditions above the ceiling. On an older building we price investigative demo before we price the work.
Drag any handle. A remodel starts further along than these do, but the finished side is the same standard and the same trades.

ShellFinished
ShellFinished
ShellFinishedThe difference from a build-out is that the business is still trading, so the phasing plan is the first deliverable rather than a detail of the schedule.
We walk it with the business running, because that is how the work will happen. The phasing plan comes out of that walk rather than out of a template.
A line-item number, with the after-hours premium priced separately so you can see what working nights costs against the revenue it protects.
Drawings and permit for the areas being touched, with the accessibility and code thresholds identified before you commit rather than at plan review.
Zone by zone. Containment up, egress and fire separation maintained, disruptive trades outside your hours, daily clean-down, revenue-generating areas open.
Each zone punched and handed back as it finishes, so the space comes back to you in pieces instead of all at the end.
The part that matters is not the bid. It is whether the space opened when they said it would.
1 of 5
Real square footage, real timelines, real brands.
1 of 3
The same crews and the same schedule, on a different kind of space.
Next step
Send us the space and the brand standards. You'll get a walkthrough scheduled inside 48 hours and a real number. Not a range, not a “starting at.”
No obligation. No pressure. If we're not the right builder for your project, we'll tell you on the call.
info@lnbconstruction.netFinancing
Spread the cost over months or years with competitive rates and pre-qualification in minutes.