The Direct Answer

Lump sum is a fixed price for a defined scope. Cost-plus pays the contractor's actual costs plus a fee. A guaranteed maximum price (GMP) is cost-plus with a ceiling. For most tenant build-outs with finished drawings, lump sum is the simplest and safest; GMP fits when the scope cannot be fully defined up front.

The Three Side By Side

Lump SumCost PlusGMP
PriceFixed for the defined scopeActual cost plus a feeActual cost plus a fee, capped
Who carries overrun riskContractor, within the scopeOwnerContractor above the cap
Who keeps savingsContractorOwnerUsually owner, or shared
Needs finished drawingsYesNoMostly
Transparency into costsLowFullFull
Admin for the ownerLowHighMedium to high

When Each One Fits

  1. Lump sum.

    The drawings are complete, the space has been walked and investigated, and you want one number. The usual choice for a tenant build-out, and what most lenders find easiest to underwrite.

  2. GMP.

    The scope is still moving, the building is older and uncertain, or you want the contractor involved before design is finished. You get transparency with a ceiling.

  3. Cost plus.

    Emergency work or scope that genuinely cannot be defined. Rare for a build-out, and only with a contractor you trust and an owner who will read every invoice.

What To Read In A GMP Contract

  • What counts as cost, and what is in the fee
  • The contingency inside the GMP, and who controls it
  • How savings under the cap are split
  • Which changes raise the cap, and how
  • The audit right: can you see the invoices?

How We Price

Most of our work is fixed-price against a defined scope, billed monthly on AIA G702 and G703 against a schedule of values. Cost-plus with a guaranteed maximum price is available where the scope genuinely cannot be defined up front.

FAQ

Is a lump sum contract the same as a stipulated sum?
Yes. Stipulated sum is the AIA's name for it.
Does a lump sum mean no change orders?
No. Owner changes, hidden conditions and authority requirements still change the price. Lump sum fixes the price of the scope as drawn.

Next step

You Signed The Lease. Let’s Get It Open.

Send us the space and the brand standards. You’ll get a walkthrough scheduled inside 48 hours and a real number. Not a range, not a “starting at.”

No obligation. No pressure. If we're not the right builder for your project, we'll tell you on the call.

Questions first? Read the build-out FAQ

info@lnbconstruction.net

Financing

Financing Available Through Trusted Partners

Spread the cost over months or years with competitive rates and pre-qualification in minutes.