Schedule Of Values: What To Check On Your Contractor's Pay Application
What to check on your contractor's pay application, line by line, every month.
- Licensed Texas General Contractor
- Bonded & Insured
- Workers’ Comp Carried
- BBB Accredited A+
- NARI Member
- On Site In All 50 States
- Escrow Services Available
The Direct Answer
A schedule of values is the line-item breakdown of the contract price, trade by trade, that every payment application bills against. It is agreed at the start of the job and appears on the AIA G703 continuation sheet. For an owner, it is the tool that shows what you are paying for and whether the billing matches the work.
What A Schedule Of Values Looks Like
A shortened example for a small retail build-out.
| Line | Scheduled Value | Complete This Period | Total To Date | Percent |
|---|---|---|---|---|
| General conditions | $18,000 | $4,500 | $9,000 | 50% |
| Demolition | $6,000 | $0 | $6,000 | 100% |
| Framing and drywall | $32,000 | $12,000 | $20,000 | 63% |
| Electrical | $28,000 | $8,000 | $14,000 | 50% |
| Plumbing | $14,000 | $3,000 | $9,000 | 64% |
| HVAC | $22,000 | $0 | $5,000 | 23% |
| Finishes | $20,000 | $0 | $0 | 0% |
Illustrative only. A real schedule is set from the contractor's bid and usually runs to 20 or more lines.
Five Things To Check Every Month
Front-loading.
Early lines such as mobilisation, demolition or general conditions priced high so the contractor is paid ahead of the work. Compare the values to the bid.
Percent complete against the site.
Walk the job. If drywall is billed at 63 percent, most of the drywall should be up.
Stored materials.
Material billed but not installed should be on site or in a bonded, insured warehouse, with invoices.
Change orders on their own lines.
Approved changes get new lines. They should not be absorbed into existing ones.
The math.
Totals, retainage and previous payments should carry forward exactly from the last application.
Why Lenders And Landlords Insist On It
A lump-sum invoice tells a lender nothing about how much of the job is built. A schedule of values lets their inspector compare each line to the site and release money against real progress. Landlords paying a TI allowance want the same thing for the same reason.
Agree the schedule of values before the first draw. Rewriting it mid-job is possible but slow, and every lender will ask why.
FAQ
Who prepares the schedule of values?
Is a schedule of values the same as a budget?
Next step
You Signed The Lease. Let’s Get It Open.
Send us the space and the brand standards. You’ll get a walkthrough scheduled inside 48 hours and a real number. Not a range, not a “starting at.”
No obligation. No pressure. If we're not the right builder for your project, we'll tell you on the call.
Questions first? Read the build-out FAQ
info@lnbconstruction.net